1. The unconnected sections of the lowered pipeline sections at various locations have to be welded, coated and back-filled to make the sections ready for post installation hydro test.
2. If a pup piece cannot be avoided for tie-in, the minimum 1.0 m length shall be added.
Prabhu TL is an author, digital entrepreneur, and creator of high-value educational content across technology, business, and personal development. With years of experience building apps, websites, and digital products used by millions, he focuses on simplifying complex topics into practical, actionable insights. Through his writing, Dilip helps readers make smarter decisions in a fast-changing digital world—without hype or fluff.
Post Views: 116