Piping Welding

senseadmin
2 Min Read
Disclosure: This website may contain affiliate links, which means I may earn a commission if you click on the link and make a purchase. I only recommend products or services that I personally use and believe will add value to my readers. Your support is appreciated!
ClauseDetails
WLD-FAB-001Applicable codes for welding are ASME B31.3, ASME Boiler and Pressure Vessel Code.
WLD-FAB-002In India, additionally IBR Regulations Apply.
WLD-FAB-003Normally in hydrocarbon insustry, Carbon Steel, Alloy Steel and Stainless Steel are the base materials to be welded.
WLD-FAB-004Welding consummables include Electrodes, Filler Wires, Argon gas etc.
WLD-FAB-005Quality of welding consummables must be ensured as per Project Welding Specification.
WLD-FAB-006Argon gas shall be 99.995 Percent Pure.
WLD-FAB-007Welders must be qualified as per applicable code e.g. B31.3
WLD-FAB-008All the welding equipment like transformers, thermocouples, pyro-meters, automatic temperature recorders, heat treatment equipmets etc. is provided by welding contractor.
WLD-FAB-009All the weld testing equipment like radiographic equipments, radiographic films, darkroom facilities, dye-penetrant testing, magnetic particle testing, ultrasonic testic etc. are provided by the welding contractor.
WLD-FAB-010Generally used welding processes are SMAW and GTAW.
WLD-FAB-011SMAW : Shielded Metal Arc Welding Process
WLD-FAB-012GTAW : Gas Tungsten Arc Welding Process
WLD-FAB-013Which welding process to be emplyed where is given in Project Welding Specification.
WLD-FAB-014Edge preparation procedure required to be carried out for different types of base materials.
WLD-FAB-015Cleaning of the edge is necessary.
WLD-FAB-016After cleaning, edges are aligned and properly spaced. Tack welding, if required is done.
WLD-FAB-017Workpieces need to be protected form weather during welding.
WLD-FAB-018Proper welding technique is usually specified in Project Welding Specification.
WLD-FAB-019Welding procedure qualification record should be submitted by Welding Contractor to the Client.
WLD-FAB-020Preheating and Post Weld Heat Treatment need to be carried out as per Project Weldng Specification.
WLD-FAB-021After welding and PWHT, Inspection and Testing of welds is done as per various testing and inspection methods specified in Project Welding Specification.
WLD-FAB-022Repairs of welds may be done if defects are within certain limits.
WLD-FAB-023Contractor has to submit various documents related to welding work done by him.
Share This Article
Follow:
Prabhu TL is an author, digital entrepreneur, and creator of high-value educational content across technology, business, and personal development. With years of experience building apps, websites, and digital products used by millions, he focuses on simplifying complex topics into practical, actionable insights. Through his writing, Dilip helps readers make smarter decisions in a fast-changing digital world—without hype or fluff.
Leave a review