Responsibilities of Piping Material Engineer
Clause Details PME-RES-001 Piping Material Engineer is required from Bid Stage, through design, construction and mechanical completion stages. PME-RES-002 Peak…
Browse our articles in publication order, with new stories added automatically.
Clause Details PME-RES-001 Piping Material Engineer is required from Bid Stage, through design, construction and mechanical completion stages. PME-RES-002 Peak…
Piping and instrument diagrams (P&ID’s) shall show connections, valves and piping for equipment filling, draining, venting and pressuring. The P&ID’s…
For design of underground piping system General Civil Design Basis shall be followed. All underground C.S .Pipes shall be painted/…
Pressure relief devices may be required between block valves where thermal expansion due to ambient temperature changes or heat tracing…
In general, offsites piping (except tankages area), electrical cable and instrumentation cable shall be laid either on pipe rack or…
Steam Header Steam header shall be located generally on the upper tier and at one end of the rack adjacent…
Slope Flare header shall be sloped towards flare knock-out drum. The desired slope shall be ensured throughout including flat loop.…
Requisite number of utility stations shall be provided throughout the unit to cater to the utility requirement. Utility stations shall…
LPG Storage Vessels shall be arranged into groups each having a maximum of six vessels. Capacity of each group shall…
Air cooled heat exchanger is a most economical way of cooling down distillation tower overhead vapors in large quantities. Location…
Catalyst Loading / Unloading All reactor piping shall be clear of the access areas of loading / unloading of catalyst.…
Pumps Equipment Layout Pumps shall be located close to equipment from which they take suction. Pumps in a process unit…