The Guyed Tower
The guyed tower is an offshore platform that rests on a spud…
Compliant Tower
A compliant tower (CT) is a fixed rig structure normally used for the offshore…
Highway CBA worked example
Introduction It is proposed to upgrade an existing single carriageway road to…
Use of economic indicators to assess basic economic viability
Once the two parameters of project life and discount rate are set…
Economic life, residual value and the discount rate
A highway project is often complex and long term, with the costs…
Identifying all relevant costs and benefits
The application of cost-benefit for project assessment in the highway area is…
Cost-benefit analysis (CBA)
Introduction Within Europe, the method usually adopted for the economic evaluation of…
Scheme Appraisal for Highway Projects
Introduction Once a transportation plan has been finalised and the demand along…
A full example of the four-stage transportation modelling process
Trip production Assume a study area is divided into seven zones (A,…
Trip distribution
Introduction The previous model determined the number of trips produced by and…


