Offsite and Yard Piping Layout
In general, offsites piping (except tankages area), electrical cable and instrumentation cable shall be laid either on pipe rack or…
Ideas and explainers from across SenseCentral.
In general, offsites piping (except tankages area), electrical cable and instrumentation cable shall be laid either on pipe rack or…
Steam Header Steam header shall be located generally on the upper tier and at one end of the rack adjacent…
Slope Flare header shall be sloped towards flare knock-out drum. The desired slope shall be ensured throughout including flat loop.…
Requisite number of utility stations shall be provided throughout the unit to cater to the utility requirement. Utility stations shall…
LPG Storage Vessels shall be arranged into groups each having a maximum of six vessels. Capacity of each group shall…
Air cooled heat exchanger is a most economical way of cooling down distillation tower overhead vapors in large quantities. Location…
Catalyst Loading / Unloading All reactor piping shall be clear of the access areas of loading / unloading of catalyst.…
Pumps Equipment Layout Pumps shall be located close to equipment from which they take suction. Pumps in a process unit…
Fired heaters are generally used to heat the feedstock so that it can be sent to a reactor for processing…
Design of Pipe Rack involves considerable planning and cor-ordination with other engineering groups. Rack Design involves following activities. 1. Pipe rack…