Making Decisions with Insulation
Many people overlook the importance of insulation in the chemical industry. Some…
Heat Exchanger Effectiveness
Calculating heat exchanger effectiveness allows engineers to predict how a given heat…
Piping Welding
ClauseDetailsWLD-FAB-001Applicable codes for welding are ASME B31.3, ASME Boiler and Pressure Vessel…
Piping Insulation
Insulation is required for the purposes of conservation of heat, maintenance of…
Painting of Piping and Equipment
High Quality painting of Structures, Equipment and Piping Systems to avoid corrosion…
Steel Pipes Thickness Chart
NPSinchesN.D.O.D.mm102030STD4060XS80100120140160XXS1/8–10.31.24–1.451.731.73–2.412.41–––––1/4613.71.65–1.852.242.24–3.023.02–––––3/81017.11.65–1.852.312.31–3.23.2–––––1/21521.342.11–2.412.772.77–3.733.73–––4.777.473/42026.672.11–2.412.872.87–3.913.91–––5.567.8212533.42.77–2.903.383.38–4.554.55–––6.359.091.1/43242.162.77–2.973.563.56–4.854.85–––6.359.71.1/24048.262.77–3.183.683.68–5.085.08–––7.1410.1625060.322.77–3.183.913.91–5.545.54–––8.7411.072.1/26573.023.05–4.785.165.16–7.017.01–––9.5214.0238088.93.05–4.785.495.49–7.627.62–––11.1215.243.1/290101.63.05–4.785.745.74–8.088.08––––16.154100114.33.05–4.786.026.02–8.568.56–11.12–13.4917.125125141.33.40––6.556.55–9.529.52–12.7–15.8719.056150168.33.40––7.117.11–10.9710.97–14.27–18.2621.958200219.13.766.357.048.188.1810.3112.712.715.0818.2620.6323.0122.22102502734.196.357.809.279.2712.712.715.0818.2621.4425.428.5725.412300323.94.576.358.389.5210.3114.2712.717.4721.4425.428.5733.3225.414350355.66.357.929.539.5211.1215.0912.719.0523.8227.7931.7535.71–16400406.46.357.929.539.5212.716.6612.721.4426.1930.9636.5240.49–18450457.26.357.9211.139.5214.2719.0512.723.8229.3634.9239.6745.24–205005086.359.5312.709.5215.0820.6212.726.1932.5438.144.4550.01–22550558.86.359.5312.709.5215.8722.2212.728.5734.9241.2747.6253.97–24600609.66.359.5312.709.5217.4724.6112.730.9638.8946.0252.3759.54–26650660.47.9212.70–9.52––12.7––––––28700711.27.9212.7015.889.52––12.7––––––307507627.9212.7015.889.52––12.7––––––32800812.87.9212.7015.889.5217.47–12.7––––––34850863.67.9212.7015.889.5217.47–12.7––––––36900914.47.9212.7015.889.5219.05–12.7––––––4010001016–––9.53––12.7––––––
Electronic Geometry Pigging
1. After successful completion of magnetic pig run EGP tool is launched. 2. This…
Magnetic Pigging
1. This is a part of pre-commissioning activity, which ensures that there is…
Receipt Terminal
1. Receipt Terminal is provided at end location location of pipeline to facilitate…
Dispatch Terminal
1. Dispatch Terminal (DT) is provided at start location of pipeline to facilitate…