Pipeline Lowering
1. Lowering shall commence after inspection of trench. 2. Trench bottom shall be free from pipe supports, stones, roots, debris, stakes, and…
Browse our articles in publication order, with new stories added automatically.
1. Lowering shall commence after inspection of trench. 2. Trench bottom shall be free from pipe supports, stones, roots, debris, stakes, and…
1. For changes in vertical and horizontal alignment, pre-fabricated cold field bends are provided. 2. Over bends are made in manner that…
1. Welding Procedure Specification (WPS) to be followed for the welding to be qualified and the Procedure qualification record (PQR) is…
Pipeline Fabrication and Installation Activities includes pipe bending, welding, pipeline string, pipeline lowering etc. Pipeline Dump Sites Acquiring of land…
1. The unconnected sections of the lowered pipeline sections at various locations have to be welded, coated and back-filled to make…
The fluid transported in the pipeline should be categorised in one of the following four groups, depending on its hazard…
1. Threaded connections (pipe to pipe, fittings), slip-on flanges and mitred connections in excess of 3 degrees shall not be used…
1. Components and fittings shall be compatible with the linepipe material in terms of weldability and also conform to the bevel…
1. Sufficient spare material should be ordered to cover for route deviations and possible pipeline damage during construction, and the set-up…
1. Materials from an abandoned pipeline may be used for a new project, provided that they can be certified as fully…
1. All materials should be procured from Manufacturers/Suppliers approved by the Client. 2. The Client shall specify if, and to what extent,…
1. Available Methods are : 1. Seamless 2. Electric Welded 3. Longitudinal Seam submerged are welded (LSAW) 4. Helical seam submerged arc welded (HSAW) 2. Submarine…