Skip to content
Sun, Oct 11, 2026 / Ideas for a clearer worldINDEPENDENT INSIGHTS · PRACTICAL TOOLS · EXPLAINERS
Sign in
basic / August 14, 2021

Re-Use of Materials

1.    Materials from an abandoned pipeline may be used for a new project, provided that they can be certified as fully complying with the specifications required for the new application. 2.    Materials shall be inspected and tested to the level presently specified for new materials, i.e. by visual, destructive and non-destructive means. 3.    Considering deterioration in service and […]


1.    Materials from an abandoned pipeline may be used for a new project, provided that they can be certified as fully complying with the specifications required for the new application.

2.    Materials shall be inspected and tested to the level presently specified for new materials, i.e. by visual, destructive and non-destructive means.

3.    Considering deterioration in service and lower past standards, re-use of materials is not encouraged.