Latest Advanced Concepts News
Electrical System (Lt) Installation , Pre-Commissioning , Commissioning Of Different Ltmcc -Abc Of Thermal Power Plant Part -III
COMMISSIONING Carry out functional checks to prove the operation of interlocks/inter-tripping between…
Steam Blowing Part -/I Abc Of Thermal Power Plant
Steam blowing of MS lines, CRH,HRH,SH,RH,HP & LP bypass pipe lines of…
Steam Blowing Stages Part-III (Boiler Commissioning) Abc Of Thermal Power Plant
Stage 3a -- Steam inlet line from COLD RE HEAT to TURBINE…
Concluding Part Steam Blowing Part -Iv Abc Of Thermal Power Plant
For the first few blows Target plates need not be kept. Afterwards…
Control And Instrumentation Of Thermal Power Station- Part -I
Instrumentation can be divided in two major Groups. A ) Primary…
Tragic Incidence At Unchahar Thermal Power Station. Likely Cause
Shocking news of Boiler explosion at Unchahar power station was very painful…
Control And Instrumentation Of Thermal Power Station
There are four instruments generally used any process plant as basic instrument…
Thermodynamics In Mechanical Engineering, Power Cycles
One mammoth example of a power cycle can be found in a…
Thermodynamics in Mechanical Engineering, Stoichiometry
During the combustion process, heat energy is released from a fuel when…
Nuclear Power, Is It The Answer?
Nuclear power, unlike fossil fuel plants, doesn’t combust fuel and therefore doesn’t…


