Pipeline Quality and Assurance and Control
1. Review and Approval of Contractors QAP for all activities. 2. Review and Approval of Contractors Inspection and Test Plans (ITP’s) with…
1. Review and Approval of Contractors QAP for all activities. 2. Review and Approval of Contractors Inspection and Test Plans (ITP’s) with…
1. The economic risk is associated with deferment of income, cost of repair, and other costs such as liabilities to the…
1. An environmental impact assessment (EIA) shall be carried out for all pipelines or groups of pipelines. 2. EIA is a process…
A formal quantitative risk assessment (QRA) shall be carried out for pipelines connected to permanently manned offshore complexes, except for…
A formal quantitative risk assessment (QRA) should be carried out in the following situations with the location classes as defined…
1. The risk associated with the pipeline, in terms of the safety of people, damage to the environment, and loss of…
1. Assembly : An arrangement of pipes and components such as a crossing, a pig trap, a block valve station or…
Sr. Code Route Size Distance Product Owner Contr. Year 1 HBJ Hazira-Bijaipur-Jagdishpur 36”/18” 1800 km Gas GAIL EIL 1986 2…
No. Transportation Mode Energy Consumption in Percentage of Energy Transported 1 Liquid Pipelines 0.5 2 Liquid -> Coastal Transportation 0.8…
1. Conceptualization 1. Establish Requirement 2. Evaluate Alternatives 3. Finalize the Concept 2. Feasibility Study 1. Pipeline route Study and Selection 2. Hydraulic Studies and Optimization 3. Establish…
Sr.No. Item Description Percentage of Capital Cost Liquid Lines Gas Lines 1 Survey, ROW and Compensation 2% 1% 2 Line…
1. Automatic Welding & Automatic UT 2. Micro-Tunneling for pipeline construction 3. Internal flow coating on line pipes for gas pipelines 4. 3LPP coating…