Skip to content
Tue, Oct 13, 2026 / Ideas for a clearer worldINDEPENDENT INSIGHTS · PRACTICAL TOOLS · EXPLAINERS
Sign in
Industrial Engineering / July 29, 2021

Pre-determined Motion Time System (PMTS)

Pre-determined Motion Time System (PMTS) – It is the work measurement technique to build up time for manual work making use of pre-determined elemental motion times. The following are the few methods of PMTS. (a) Method Time Measurement (MTM) (b) Work Factor System (WFS) (c) Basic Motion Time Study (BMTS) (d) Motion Time Analysis (MTA)

Pre-determined Motion Time System (PMTS) – It is the work measurement technique to build up time for manual work making use of pre-determined elemental motion times. The following are the few methods of PMTS.

(a) Method Time Measurement (MTM)

(b) Work Factor System (WFS)

(c) Basic Motion Time Study (BMTS)

(d) Motion Time Analysis (MTA)