Skip to content
Tue, Oct 13, 2026 / Ideas for a clearer worldINDEPENDENT INSIGHTS · PRACTICAL TOOLS · EXPLAINERS
Sign in
Accounting Basics / August 18, 2021

Cost Accounting – Standard Costing

Planned cost is a key for effective cost control which is not provided by historical cost concepts. The standard costing system was developed to overcome the drawbacks of the historical costing system. Since historical costing deals only with the actual costs incurred, it is not an effective device of cost control. Standard costing tells us […]

Planned cost is a key for effective cost control which is not provided by historical cost concepts. The standard costing system was developed to overcome the drawbacks of the historical costing system. Since historical costing deals only with the actual costs incurred, it is not an effective device of cost control.

Standard costing tells us what should be the cost of the product and if the actual cost exceeds the projected cost, the standard costing system can point to the reason of deviation.