
Case 5: Introducing Customer Involvement
We now introduce the Customer Involvement gene, which means that there will be some requirements churn, however requirements…
August 19, 2021 · Prabhu TL
We now introduce the Customer Involvement gene, which means that there will be some requirements churn, however requirements…
August 19, 2021 · Prabhu TL
In this case we will allow refactoring. As described earlier (5.2.3) this means that when the “technical/design debt”…
August 19, 2021 · Prabhu TL
In the next experiment, we ‘turn off’ the waterfall switch. This activates the iterative/incremental gene and the feature-driven…
August 19, 2021 · Prabhu TL
Earned Value Management (EVM) is a management methodology for monitoring and controlling schedule, cost, and scope. It allows…
August 19, 2021 · Prabhu TLAs a base-case, we start by executing the model in “waterfall mode” by using our ‘Switch for Waterfall”.…
August 19, 2021 · Prabhu TL
In order to perform “what if” analysis and sensitivity tests on the effects produced from the interaction of…
August 19, 2021 · Prabhu TL
Figure 63 shows the portion of the APD model that addresses staffing and experience gain. The construct is…
August 19, 2021 · Prabhu TL
As described previously, creating a “CI Environment” means acquiring, installing, and configuring the tools and servers necessary to…
August 19, 2021 · Prabhu TL
The portion of the model, shown in Figure 57, is a very simplistic approximation of the effects of…
August 19, 2021 · Prabhu TL
Customer Involvement has some positive and some negative effects on our core APD rework cycle. What could be…
August 19, 2021 · Prabhu TL