Skip to content
Wed, Oct 14, 2026 / Ideas for a clearer worldINDEPENDENT INSIGHTS · PRACTICAL TOOLS · EXPLAINERS
Sign in
BROWSE THE ARCHIVE

Author: Prabhu TL

Prabhu TL is a SenseCentral contributor covering digital products, entrepreneurship, and scalable online business systems. He focuses on turning ideas into repeatable processes—validation, positioning, marketing, and execution. His writing is known for simple frameworks, clear checklists, and real-world examples. When he’s not writing, he’s usually building new digital assets and experimenting with growth channels.

Power System Operation and Control

IMPORTANT TERMINALOGIES

Connected load It is the sum of continuous ratings of all the equipments connected to supply systems. Maximum…

August 11, 2021 · Prabhu TL
Power System Operation and Control

ECONOMIC OF GENERATION

Load curves The curve showing the variation of load on the power station with respect to time The…

August 11, 2021 · Prabhu TL
Power System Operation and Control

SYSTEM LOAD VARIATION

The variation of load on the power station with respect to time.  SYSTEM LOAD  •         From system‟s point of…

August 11, 2021 · Prabhu TL
Power System Operation and Control

CONCEPT OF REAL AND REACTIVE POWER

Let ‘V’ be the Instantaneous voltage Let ‘i’ be the Instantaneous current V = Vm sin ωt I =…

August 11, 2021 · Prabhu TL
Power System Operation and Control

Overview of Power System Control

·         The function of an electric power system is to convert energy from one of the naturally available forms…

August 11, 2021 · Prabhu TL
Power System Operation and Control

Power System Operation

(i) Load Forecasting, (ii) Unit Commitment and (iii) Load Scheduling. POWER SYSTEM OPERATION  (i) Load Forecasting, (ii) Unit…

August 11, 2021 · Prabhu TL
Power System Operation and Control

National Load Despatch Centre

Vision & Mission Vision:  To be a global institution of excellence for reliable & resilient power systems, fostering…

August 11, 2021 · Prabhu TL
Linear integrated circuits and applications

Functional Testing

FBM: In the memory region, the bits are arranged in rows and columns. If one or two bits fail randomly…

August 11, 2021 · Prabhu TL
Linear integrated circuits and applications

Testing Basics

Basics: In this chapter we will learn the details of testing a IC during and after fabrication. We…

August 11, 2021 · Prabhu TL
Linear integrated circuits and applications

Chemical mechanical planarization (CMP)

The production level CMP tool will be approximately 6 feet tall and  8 feet in diameter. It has…

August 11, 2021 · Prabhu TL